Power Supply And Crt Display

Equipment Required (see Table 4-1)

Leveled Sine-Wave Generator (Item 2)

Digital Voltmeter (Item 11)

Time-Mark Generator (Item 3)

Test Oscilloscope and 1X Probe (Item 12)

50-£2 BNC Cable (Item 4)

DC Voltmeter (Item 13)

50-i2 BNC Termination (Item 5)

Screwdriver (Item 14)

Variable Autotransformer (Item 10)

See AEMtMVMM(W tiKATWtl 1 at the back o f this manual for location of test points and adjustments.

See AEMtMVMM(W tiKATWtl 1 at the back o f this manual for location of test points and adjustments.

NOTE

Before applying power to the 2213, make the initial control settings. Connect the 2213 to an appropriate power source through a variable autotransformer, adjusted for an output of 115 V. Apply power to both the instrument and the test equipment and allow a 20-minute warm-up period before commencing the adjustments and checks.